The controller calculates the temperature differences
between collector sensor S1 and tank sensors S2 and S3. If
the differences are larger than or identical to the adjusted
switch-on temperature differences (DT1O / DT2O), the
solar pump will be operated by relay 1, and the respective
tank zone will be loaded until the switch-off temperature
differences (DT1F / DT2F) or the maximum tank tempera-
S4 / TR
Arr 4
Display Channels
Channel Description Terminal Page
COL x Temperature collector S1 37
TSTB x Temperature tank 1 bottom S2 37
TSTT x Temperature tank 1 at the top S3 37
S4 x Temperature sensor 4 S4 37
TR x* Temperature return sensor S4 37
n % x Pump speed relay R1 38
hP1 x Operating hours R1 R1 38
hP2 x Operating hours R2 R2 38
kWh
x*
Heat quantity kWh - 38
MWh
x*
Heat quantity MWh - 38
TIME x Time - 34
tures (S1MX / S2MX) are reached. The priority logic causes
priority loading of the upper zone of the tank, if possible.
The 3-way-valve will be operated by relay 2 then.
Sensor S4 can optionally be connected for measurement
purposes.
If energy metering (OHQM) is activated, sensor S4 has to
be connected as return sensor.