SCU224
3. Primary commissioning
For primary commissioning the system configuration has to be adjusted first
1. AC power supply must be activated at first. The controller
passes an initialisation phase during which the operating
control lamp is blinking red and green. After having finished
the initialisation, the controller is in automatic operation
with factory settings. The factory default system configu-
ration is Arr 1.
2. Clock time adjustment in channel TIME. By pressing the
button once you can adjust hours, pressing it
once again the minutes.The time can be adjusted by buttons
+ and - and saved by pressing the button.
3. - select adjustment channel Arr
- change into -mode (see 2.1)
- adjustment are saved by pressing button SET
Now the controller is ready for operation and should enable
an optimum operation of the solar system with the factory
settings.
System configurations:
Arr 1 : standard solar system
Arr 2 : solar system with heat exchange
Arr 3 : solar system with after-heating
Arr 4 : solar system with tank charge in layers
Arr 5 : 2-tank solar system with valve logic
Arr 6 : 2-tank solar system with pump logic
Arr 7 : solar system with 2 collectors and 1 tank
Arr 8 : solar system with after-heating by solid hot fuel
boilers
Arr 9 : solar system with heating circuit reverse raising
backward
forward
SET
(selection / adjustment mode)
operating control lamp
Arr 1 Arr 2
Arr 3 Arr 4
Arr 5 Arr 6
Arr 7 Arr 8
Arr 9
+
OK
–